1965 - Hunt Selected as Fairway Operator
In 1965, Hunt led the effort to unitize the Fairway field, and the company was later chosen as the operator of the James Lime reservoir, which required pressure maintenance to optimize recovery.
In 1965, Hunt led the effort to unitize the Fairway field, and the company was later chosen as the operator of the James Lime reservoir, which required pressure maintenance to optimize recovery.